Oil & Gas News

TechnipFMC Awarded Subsea Installation Contract by Chevron Australia

TechnipFMC has been awarded a subsea installation contract by Chevron Australia, for the Gorgon Stage Two development, located offshore Western Australia in water depths ranging from 250 to 1,340 meters.

The contract covers the project management and engineering, transportation, installation and pre-commissioning of umbilicals and flying leads as well as manifolds. The award also includes fabrication, transportation, installation and testing of rigid spools.

gorgon timeline march2016Photo credit: Chevron

TechnipFMC will leverage local capabilities as well as its global state-of-the-art pipelay fleet for the offshore campaign.

Hallvard Hasselknippe, President of TechnipFMC’s Subsea business, commented: “We are pleased TechnipFMC has been selected for this significant contract. We value our long-term, collaborative relationship and are committed to bring the best assets and our solid experience in project execution, fabrication and installation to the field.”

The Gorgon project is operated by Chevron Australia and is a joint venture of the Australian subsidiaries of Chevron (46.3%), ExxonMobil (25%), Shell (25%), Osaka Gas (1.25%), Tokyo Gas (1%) and JERA (0.417%). The Phase 2 development aims to upgrade the project’s existing subsea facilities to ensure production is maintained for future gas supply.

Offshore Source Logo

Offshore Source keeps you updated with relevant information concerning the Offshore Energy Sector.

Any views or opinions represented on this website belong solely to the author and do not represent those of the people, institutions or organizations that Offshore Source or collaborators may or may not have been associated with in a professional or personal capacity, unless explicitly stated.

Corporate Offices

Technology Systems Corporation
8502 SW Kansas Ave
Stuart, FL 34997

info@tscpublishing.com