Maritime News

New Hybrid Ro-Ro Ships Ordered for Stena Line

On behalf of Stena Line, Stena RoRo has designed and ordered two hybrid cargo ships from the Chinese shipyard CMI Jinling in Weihai. The ships can be powered by methanol or conventional fuel and have been developed in line with future environmental requirements, for example by using batteries as a future means of propulsion.

Major emphasis has been placed on optimizing the cargo capacity, which has been increased by 80%.

The vessels have been specially designed for Stena Line's route between Belfast and Heysham on the Irish Sea and therefore have enhanced maneuverability. Stena RoRo is responsible for the contract and construction of the NewMax vessels and delivery is scheduled for 2025.

“These vessels are a further development of our previous cargo ship concepts where focus on sustainability and future-proofing with multi-fuel combustion engines are prioritized,” says Per Westling, managing director of Stena RoRo.

Both cargo vessels are designed with limited length and shallow draught to suit the special conditions in the narrow port of Heysham.

Offshore Source Logo

Offshore Source keeps you updated with relevant information concerning the Offshore Energy Sector.

Any views or opinions represented on this website belong solely to the author and do not represent those of the people, institutions or organizations that Offshore Source or collaborators may or may not have been associated with in a professional or personal capacity, unless explicitly stated.

Corporate Offices

Technology Systems Corporation
8502 SW Kansas Ave
Stuart, FL 34997

info@tscpublishing.com