Oil & Gas News

48 Hour Equipment Mobilization from Claxton Prevents Rig Down Time

ClaxtonlogoClaxton Engineering Services Ltd, an Acteon company, successfully responded to an urgent call to mend a rig diverter’s connection by providing a 30” dual seal overshot, a 30” casing cutter and personnel to oversee operations and requirements within 48 hours.

During this time period, Claxton modified and dispatched the necessary equipment for its client. Under normal circumstances, this equipment is ordered a month in advance by the drilling contractor during well planning.

The connection to the rig diverter prohibited the rig from operating. Claxton modified the overshot by cutting it to the precise size and welded the connection on top creating a pressure seal.

Additionally, Claxton supplied cold-cutting equipment to ensure the space-out was correct for the overshot. The wellhead fit seamlessly after the drilling and casing operations had been completed which will provide continuous flow.

“As a core value, Claxton strives to be a responsive company within the oil and gas industry,” said Owen Lewis, Claxton project engineer. “We are prepared and willing to assist our clients with any problems that arise, and we are quick and efficient in completing the job.”

.
Offshore Source Logo

Offshore Source keeps you updated with relevant information concerning the Offshore Energy Sector.

Any views or opinions represented on this website belong solely to the author and do not represent those of the people, institutions or organizations that Offshore Source or collaborators may or may not have been associated with in a professional or personal capacity, unless explicitly stated.

Corporate Offices

Technology Systems Corporation
8502 SW Kansas Ave
Stuart, FL 34997

info@tscpublishing.com